CAPSULECITY.

A physical architecture game. A digital client brief.

ISSUE / 5.20 · PWA
Retro-futurist architectural collage in terracotta, anthracite and concrete tones, inspired by capsule megastructures and Japanese utopian architecture.
Start a new project

Build, adapt, transform.

Generate a client's brief and reshape your 3D-printed city across changing commissions. The app manages the brief; you design the building.

Kit: 38 residential capsules · 12 commercial capsules · 30 Structural Bricks · 8 Terrace Common Spaces · 6 Garden Common Spaces (rectangular/pointed shapes chosen freely).

ILLUSTRATED BUILDING RULESASSEMBLY GUIDE6 technical sheets · Tap to enlarge

Choose a technical sheet. Tap to enlarge.

01 / COMPONENTS

GAME REFERENCEMASTER OF ARCHITECTUREBriefs · Events · Directives · Notices
BEFORE YOU BUILD / GENERATOR GUIDE

What can happen to your city?

The initial brief uses an Initial Configuration. Later commissions combine an Urban Event, an Intensity and a Design Directive. All possible conditions and outcomes are listed below.

Initial Configurations

The initial commission uses one of these eight construction conditions, instead of an Urban Event or a turn-based Design Directive. The initial brief always includes exactly 1 Terrace, 0 Gardens and a Structural Budget of 8 Bricks. The player confirms stability and compliance with the chosen condition.

  1. SINGLE TOWERBuild the entire initial programme using exactly one structural tower.
  2. TWO TOWERSDistribute the initial programme across exactly two structural towers.
  3. TOP COMMON SPACEPosition the initial Terrace so that its upper surface is the highest point of the entire construction. No element may extend above it.
  4. MINIMUM HEIGHTBuild the initial programme with the lowest overall building height possible, while maintaining stability.
  5. VERTICAL COMPOSITIONBuild a construction whose overall height exceeds its greatest horizontal dimension, including Capsules and the Terrace.
  6. DISTRIBUTED STRUCTUREDistribute the initial programme across at least three structural towers.
  7. GROUND-LEVEL COMMON SPACEPlace the initial Terrace directly on the ground as a ground-level element of the construction.
  8. INTERMEDIATE COMMON SPACEPosition the initial Terrace above ground level and below the highest part of the construction, with built elements both below and above it.
Urban Events
  1. HOUSING BOOMIncrease Residential Capsules. The Intensity determines the amount.
  2. COMMERCIAL EXPANSIONIncrease Commercial Capsules, scaled to the smaller commercial inventory.
  3. MIXED-USE DEVELOPMENTIncrease Residential and Commercial Capsules together.
  4. RESIDENTIAL DECLINEReduce Residential Capsules.
  5. COMMERCIAL DECLINEReduce Commercial Capsules.
  6. COMMERCIAL CONVERSIONRemove Residential Capsules and add Commercial Capsules.
  7. RESIDENTIAL CONVERSIONRemove Commercial Capsules and add Residential Capsules.
  8. COLLECTIVE SPACE EXPANSIONModerate: add 1 Common Space. Significant: add 2. Major: add 2 and relocate 1 existing Common Space. Radical: add 3 and relocate 2 existing Common Spaces. The generator assigns the exact Terrace/Garden mix. No capsule relocation is imposed by this event.
  9. URBAN GREENINGModerate: convert 1 Terrace into a Garden. Significant: add 1 Garden and convert 1 Terrace. Major: add 2 Gardens. Radical: add 2 Gardens and convert 1 Terrace. Conversion physically exchanges a Terrace piece for a Garden piece; no capsule relocation is imposed.
  10. COMPREHENSIVE REDEVELOPMENTChange ALL THREE programmes: Residential Capsules, Commercial Capsules and Common Spaces (quantity or Terrace/Garden composition). No prescribed structural relocation.
Intensities

The scale of a commission. Capsule events use numeric unit bands; Common Space events use their own 1–3-piece scale. Different pieces are not interchangeable to fill an intensity.

  1. MODERATECapsules: 3–5 units / Common Spaces: see event15%
  2. SIGNIFICANTCapsules: 5–8 units / Common Spaces: see event40%
  3. MAJORCapsules: 8–12 units / Common Spaces: see event35%
  4. RADICALCapsules: 12–16 units / Common Spaces: see event10%
Design Directives
  1. VERTICAL EXTENSIONMeet the programme and aim for a higher maximum height than at the start of the turn. If that is impossible, try to maintain the previous maximum height; if neither is feasible, build the tallest configuration achievable with the required programme. Total Footprint may change; structural stability is essential.
  2. VERTICAL CONTRACTIONMeet the programme and aim for a lower maximum height than at the start of the turn. If that is impossible, try to maintain the previous maximum height; if neither is feasible, build the lowest possible configuration. Total Footprint may change.
  3. HORIZONTAL EXPANSIONCreate a connected lateral extension that increases Total Footprint. Build or reorganize at least one structural tower carrying at least four Residential and/or Commercial Capsules within that new extension.
  4. NEW TOWERBuild at least one additional, distinct structural tower made of at least 3 Structural Bricks.
  5. COMPACT GROWTHIncrease the built programme while keeping the Total Footprint unchanged and never exceeding the previous turn’s maximum building height. All existing elements may be reorganized within these limits.
  6. REUSE EXISTING STRUCTUREDo not add any new Structural Bricks or Common Spaces. Reconfigure and reuse only those already built.
  7. STRUCTURAL PRESERVATIONKeep existing Structural Bricks and Common Spaces fixed. Only vertical additions from existing elements are allowed; no new towers or lateral Common Space connections. Capsules may move.
  8. RELOCATE A TOWERMove at least one existing structural tower.
  9. REDISTRIBUTE CAPSULESMove at least eight existing Residential and/or Commercial Capsules to different attachment positions.
  10. CHANGE THE SKYLINEReconfigure every existing tower, changing heights, number and/or locations so no existing tower is left unchanged.
  11. PROTECT COMMON SPACESPreserve the position and Terrace/Garden type of each existing Common Space.
  12. RECONFIGURE COMMON SPACESChange the spatial relationship of at least two existing Common Spaces. Use any lateral and vertical connections permitted by the Assembly Rules, without restrictions on the method.
  13. FOOTPRINT MINIMIZATIONMeet the assigned programme and reorganize the building to achieve the smallest feasible Total Footprint for this commission.
  14. FOOTPRINT MAXIMIZATIONOnly eligible when at least 2 Common Spaces are already installed at the start of the turn. Meet the assigned programme and reorganize the building to achieve the largest feasible Total Footprint for this commission.
Urban Notices · Unexpected city regulations

Starting with the first transformation turn (after the initial commission), an Urban Notice can arrive from an outside authority at each new commission, with a 65% chance if no notices are active, a 50% chance if one is active, and no new notice if two are active. At most one notice is issued per turn and never more than two notices remain active at once. The duration is drawn independently for each notice: 1 turn (35%), 2 turns (45%), 3 turns (15%), or until game end (5%). A notice may remain active even if it has no immediate effect: new elements can fall within its scope later. Nothing already completed is retroactively invalidated. A later incompatible Urban Event or Design Directive supersedes an earlier notice automatically when the conflict can be established from the rules and programme. For example, VERTICAL CONTRACTION supersedes ROOFTOP HERITAGE PROTECTION, while CHANGE THE SKYLINE supersedes HERITAGE PROTECTION ORDER. An urban footprint moratorium does not automatically conflict with FOOTPRINT MAXIMIZATION. The two tower-heritage notices are not issued together. A REDISTRIBUTE CAPSULES directive requires at least eight existing Capsules still available for relocation after protected and removed Capsules have been excluded. The player still checks the physical feasibility of the construction.

  1. HERITAGE PROTECTION ORDERIssued by: CULTURAL HERITAGE COMMISSION · Duration: Random (1–3 turns or until game end). The commission requests protection of up to three structural towers. Preserve their Structural Bricks in place and orientation. If fewer than three towers exist, preserve those present; additional towers built while this notice is active become protected until the limit of three is reached. Capsules may change.
    Applicability: No towers exist yet: the order stands and begins protecting qualifying towers when they are constructed.
  2. FOUNDATION PROTECTION ACTIssued by: MUNICIPAL BUILDING AUTHORITY · Duration: Random (1–3 turns or until game end). Following concerns about stability, preserve the Structural Bricks beneath the lowest Common Space. If a Common Space is itself the lowest element, preserve that Common Space in position, orientation and type. Protection attaches to the first qualifying existing or newly built configuration and does not extend to later unrelated elements.
    Applicability: If no Common Space is present, the order remains in force and applies as soon as one appears.
  3. ROOFTOP HERITAGE PROTECTIONIssued by: ARCHITECTURAL CONSERVATION BOARD · Duration: Random (1–3 turns or until game end). Preserve Structural Bricks above the highest Common Space. The board protects existing upper structures and newly qualifying structures while the notice lasts; parts below may be reconfigured.
    Applicability: If no Bricks are currently above a Common Space, the notice remains in force and protects any that subsequently occupy that position.
  4. PROTECTED URBAN GARDENSIssued by: NEIGHBOURHOOD GREEN COMMITTEE · Duration: Random (1–3 turns or until game end). A residents’ petition protects up to two Garden Common Spaces, including Gardens added while the notice is active until two are protected. Preserve each protected Garden’s location and type.
    Applicability: With no Gardens present, the petition remains on file and protects the first Garden(s) subsequently installed.
  5. SKYLINE RESTRICTIONIssued by: CITY PLANNING DEPARTMENT · Duration: Random (1–3 turns or until game end). A new zoning plan prohibits any increase beyond the maximum building height recorded when the notice was issued. You may build below that limit.
    Applicability: Applies to the existing skyline immediately; growth within the established height is allowed.
  6. NO MORE TOWERS!Issued by: NEIGHBOURHOOD ASSOCIATION · Duration: Random (1–3 turns or until game end). Residents protest against further independent towers. The number of structural towers must not increase while this notice is active. Extensions and reconfiguration of existing towers remain possible.
    Applicability: Applies even if there is only one tower: additional independent towers are forbidden.
  7. URBAN SPRAWL MORATORIUMIssued by: MUNICIPAL PLANNING OFFICE · Duration: Random (1–3 turns or until game end). The new development plan freezes the current Total Footprint: do not increase its outer plan-view extent. Build or rearrange within that outline instead.
    Applicability: Applies to the footprint recorded at issuance.
  8. POST-EARTHQUAKE CONSTRUCTION RESTRICTIONIssued by: SEISMIC SAFETY AUTHORITY · Duration: Random (1–3 turns or until game end). After recent seismic events, do not install new Structural Bricks directly above Common Spaces during the restriction. Bricks already there may stay; other forms of extension remain possible.
    Applicability: The prohibition applies to new construction above existing and subsequently added Common Spaces. This is a game rule, not an engineering safety assessment.
  9. TENANTS REFUSE TO MOVEIssued by: RESIDENTS’ COMMITTEE · Duration: Random (1–3 turns or until game end). A tenants’ petition protects half of the Residential Capsules present when the notice is issued, rounded up to the next whole Capsule. Keep those selected Capsules in their existing attachment positions. The protected set is fixed at issuance and does not expand to newly added Capsules.
    Applicability: No existing Residential Capsules: this notice is excluded from the draw.
  10. SHOPKEEPERS’ PROTESTIssued by: LOCAL BUSINESS ASSOCIATION · Duration: Random (1–3 turns or until game end). Local shopkeepers oppose displacement. Preserve the positions and commercial function of up to three Commercial Capsules. If fewer are present, protect those available; only shops already present when the notice arrives are protected.
    Applicability: Issued only when existing Commercial Capsules can actually be protected; never drawn with zero existing shops or a compulsory reduction below the protected number.
  11. SAVE OUR TERRACEIssued by: COMMUNITY SPACE COMMITTEE · Duration: Random (1–3 turns or until game end). The Community Space Committee requires the existing Terrace that supports the greatest number of Structural Bricks and Residential or Commercial Capsules above it to remain in its current position, orientation and Terrace designation. Count pieces supported directly or indirectly by each Terrace, not unrelated pieces at higher elevations. If two or more Terraces tie, you may choose which tied Terrace to protect. Other Terraces may be transformed.
    Applicability: This notice may be issued only when at least one Terrace already exists at the start of the turn and at least one Terrace remains in the assigned programme. No Terrace: the notice is excluded from the draw.
  12. KEEP THE CONNECTION OPENIssued by: PUBLIC ACCESS COMMISSION · Duration: Random (1–3 turns or until game end). Preserve one direct connection between two Common Spaces, including the positions of both spaces. If none exists, the first direct Common Space connection built while the notice lasts becomes protected.
    Applicability: Until a qualifying connection exists, the notice has no immediate effect but remains active.
The Pritzker Jury · 11 possible verdicts

The final project is frozen BEFORE the jury reveals its secret criterion. No post-reveal rebuilding. Some criteria are checked automatically from the game programme or elapsed playing time; others need one honest YES / NO about the physical building. The jury is deliberately capricious: even a perfectly completed city may lose. There are eight normal criteria and three rare conceptual scandals (2% each, 6% total). The newspaper reports the result in the approved vintage style. For Unlimited mode, the timed criterion is omitted. Each scheduled turn is allotted 3 minutes 30 seconds, including the initial construction period in the overall elapsed time.

  1. TOO LATE TO BE RADICALThe future has an expiration date. Complete all turns within 3 minutes 30 seconds per scheduled turn. Check: Automatic.
  2. LESS IS THE NEW MOREConcrete is expensive. Restraint is fashionable. Finish with at least 25 total Capsules and at least 6 of the 30 Structural Bricks physically unused. Check: Capsules automatic; unused Bricks: player confirmation.
  3. GREEN IS THE NEW BLACKThe jury has discovered photosynthesis. Finish with at least 4 Garden Common Spaces. Check: Automatic.
  4. THE SKY IS NOT THE LIMITThe jury refuses to look down. Finish with at least 5 distinct occupied Capsule levels. Each horizontal tier counts once. Check: Player confirmation.
  5. MORE IS MOREMinimalism has been officially cancelled. Finish with at least 3 separate structural towers. Check: Player confirmation.
  6. HOUSING IS A HUMAN RIGHTThis year, the jury remembers people live here. Finish with at least 26 Residential Capsules. Check: Automatic.
  7. THE CITY MUST SPRAWLThe jury is suddenly fascinated by horizontal growth. Finish with a maximum horizontal dimension greater than the entire building height. Check: Player confirmation.
  8. THE COMMON GOODPrivate Capsules are out. Collective life is in. Finish with at least 5 Common Spaces in total (Terrace + Garden). Check: Automatic.
  9. THE FIRST HUTThe jury celebrates the elimination of everything that came after the invention of shelter. Two branches leaning against one another in a meadow are awarded the Pritzker as the revolutionary return to the primitive hut. Your building contains an excessive amount of architecture. Check: Automatic rejection.
  10. ZERO OCCUPANCYA building liberated from the burden of accommodating anyone. A one-metre wooden stick planted vertically in a meadow wins. Its creator says that assigning it a function would compromise the work. Your building contains an excessive amount of architecture. Check: Automatic rejection.
  11. THE UNBUILT PAVILIONDiscarded planks win the Pritzker. Two wooden planks found stacked beside a landfill are mistaken by the jury for a revolutionary pavilion by an anonymous architect. The unknown creator wins the prize. Your building contains an excessive amount of architecture. Check: Automatic rejection.

How the generator chooses

1 / Exact client programme. The kit has 38 Residential Capsules, 12 Commercial Capsules, 30 Structural Bricks, 8 Terrace Common Spaces and 6 Garden Common Spaces: 94 architectural pieces total. The Urban Event assigns exact numbers of all four functional types; the player freely chooses the physical arrangement and the Common Space shape (rectangular or pointed). Structural Bricks use a progressive budget (8 initially, up to 30 by the final turn; turn 10 in Unlimited mode) instead of a manual counter. The player verifies the physical maximum is respected.

2 / Event, intensity and directive. Each Urban Event changes the programme, the Intensity sets the amount and the Design Directive imposes architectural constraints. Collective Space Expansion specifies both new Terrace and new Garden counts. Urban Greening uses Garden additions and/or physical Terrace-to-Garden conversions. Comprehensive Redevelopment affects housing, shops and Common Spaces in the same commission. New Common Space requests NEVER become extra capsules when supplies are insufficient.

3 / Weighted intensity. Moderate 15%, Significant 40%, Major 35% and Radical 10% are the starting weights. Capsule changes use numerical ranges; Common Space changes follow the separate intensity recipes listed above. The generator removes numerically impossible or incompatible combinations, so actual frequencies vary. Event repetition is discouraged and growth favoured when housing density is low.

4 / Player verification. The app cannot inspect the model. Check that every assigned physical piece is installed, all joints are valid, each tower's Structural Brick footprint remains at most 72 × 72 mm, the Total Footprint meets the directive, and the complete construction is stable. The player is responsible for geometry and structural safety.

The initial commission: exactly 12–17 Residential Capsules, 1–3 Commercial Capsules, 1 Terrace and 0 Gardens, plus a starting Structural Brick allowance. The initial design challenge defines the overall architectural arrangement, height or position of the Terrace. These numbers are assigned, not manually selected.

Initial build

Initial commission

QUICK REFERENCEARCHITECT’S VADEMECUMQuick rules · Illustrated guide

CAPSULES: attach only to the sides of Structural Bricks, never to each other or directly to Common Spaces. Keep Capsules horizontal, with connector slots vertical.

COMMON SPACES: keep their open sides facing upward. Lateral arrangements follow the 72 × 72 mm grid. Never directly cover the 72 × 72 mm garden area with any Common Space module or part of one.

STRUCTURAL TOWERS: Structural Bricks of each tower stay within one 72 × 72 mm base. Adjacent towers remain separate and their Bricks cannot be connected to each other.

MEASUREMENTS: one vertical module = 36 mm. Total Footprint is the combined plan-view projection of Common Spaces across all levels; Capsules are excluded.

FINAL CHECK: follow the brief and any active restrictions; verify the geometry and structural stability yourself.

Current client's brief
START0:00
0
0
1
0
0

Current challenge

URBAN EVENT
Initial commission


DESIGN DIRECTIVE

Construction programme

TARGET AFTER THIS TURN · Build the quantities below. Structural Bricks are limited by the available budget; check stability before confirming.

Residential Capsules
0
Commercial Capsules
0
Terrace Common Spaces
0
Garden Common Spaces
0
Structural BudgetUp to 30 Structural Bricks can be used
0/ 30

Build the required programme to proceed.

Project history